Renovation Updates 4/6
The Great Renovation continues this week with the electrical contractor removing the old 200 amp electrical service from exterior since the new 400 amp service is now complete. Exterior window caulking continues along with installation of the new entrance vestibule windows and door front on the north side. The entrance doors will have electrical operators for opening
Renovation updates 3/30
The Great Renovation continues this week with completion of the exterior siding on the stair/elevator tower east side where heat pumps will be located in addition to exterior caulking of new windows in the ’67 addition and south addition. The new storefront window and door framing installation on the north entrance vestibule is progressing. Interior
Renovation Updates and Pics for 3/21
The Great Renovation continues this past week with siding and trim finishing up on the south addition where the heat pumps will be located, siding and trim work is ongoing on the north side (Park Street) restroom at the vestibule, drywall continues inside in the stair tower, second floor and ’67 addition. Some plaster that
Renovation Updates for 1/20
The Great Renovation continues this week with a full complement of tradesmen for carpentry, masonry, insulation, mechanical, electrical and site work. The north entrance vestibule canopy pad was poured, water and waste lines were installed in the ADA bathroom at north foundation and stubbed through the historic foundation wall into the basement, window and door
Renovation Updates for 1/13
The Great Renovation continued this week with a full complement of trades on the job after a well-deserved holiday break! Mechanical work included extending the boiler chimney up through the roof of the stair tower/elevator shaft which enabled the finishing touches of exterior framing and sheathing to be completed on the east side. Mechanical also