Renovation Updates 11/23
Good Morning and Happy Thanksgiving to all. Although a short week, the Great Renovation continues with framing of the second floor of the south addition along with the elevator shaft and stairwell. The back door exterior concrete pad was poured and exterior door frame installed. The sidewalk section along Franklin Street that was removed to […]
Renovation Updates 11/23 Read More »