Renovation Updates 11/23
Good Morning and Happy Thanksgiving to all. Although a short week, the Great Renovation continues with framing of the second floor of the south addition along with the elevator shaft and stairwell. The back door exterior concrete pad was poured and exterior door frame installed. The sidewalk section along Franklin Street that was removed to
Bruce’s Renovation Updates – 10/28
The Great Renovation continues this week with framing of new walls on the second floor of the 1967 addition, installation of door and window frames on the second floor, installing overlay on first floor of the 1967 addition, begin reinforcing roof rafters above the third floor, forming and pouring concrete for the stair tower and
Bruce’s Renovation Updates for 10/21
The BFPL Great Renovation continues this past week with pouring of the elevator room concrete foundation on the south side of the building, construction of a masonry wall at the basement level between the elevator room and the basement interior spaces, installation of lateral (horizontal) braces in the third floor ceiling, reinforcing of roof joists/first
Off the Shelf for 10/18
Did you know: Sue Wetmore and Nate Dansereau are hosting a Birding Around Brandon talk Oct 24 from 6-7pm. Learn about Brandon’s birding hot spots and more! New in for DVDs! Elemental (Rated PG). Ember, a young fire element in Element City, learns from water elemental Wade that they have much more in common than
Bruce’s Renovation Updates Oct 13
The Great Renovation continues this week with new wall openings being cut in between the historic library and the 1967 addition on the second floor. This is a brick wall that has to be carefully opened up and reinforced. Wall insulation continues to be installed in the 1967 addition with wood strapping over the insulation