Renovation Updates 5/3

The Great Renovation edges ever closer to the finish line this week with finish painting of door frames, window frames, ceiling trim with crown molding, exterior siding on the south side and bathrooms. Trim is being installed around the elevator doors at each landing, maple trim is being installed around windows and first floor hardwood […]

Renovation Updates 5/3 Read More »

Renovation Updates 4/28

Progressing toward the finish line, the Great Renovation continues this week with exterior siding preparations for finish painting and final caulking. With warmer weather on the rise finish painting of siding will begin soon. Fiber optic cabling for internet service was installed from the utility pole into the interior network interface. Painting of ceilings and

Renovation Updates 4/28 Read More »

Scroll to Top

Now in our Library of Things!

(items with an  * are in-library use only):

Laptops

Chromebook

iPads

Android Tablet

Ukeleles

Sewing Machine*

Serger*

Button Maker*

Green Screen

3-D Printer*

Microphone

Owl camera*

Circuit

Heat Press

Snowshoes

Baby Carrier (back pack)

Projector

Wi-fi Free Tablets for Kid

Dash Robot

Indi Robot

Portable Power Station

Moisture Meter

 

Join the Cover to Cover

Stay up to date on library events and news with our newsletter. Opt out at any time.