The BFPL Great Renovation continues this past week with pouring of the elevator room concrete foundation on the south side of the building, construction of a masonry wall at the basement level between the elevator room and the basement interior spaces, installation of lateral (horizontal) braces in the third floor ceiling, reinforcing of roof joists/first floor joists/second floor joists that had been cut out in years past, installation of plywood subfloor in the 1967 addition second floor to provide a solid surface for new carpeting and preparation for construction of interior wall partitions to accommodate the new layout. Stay tuned!