The Great Renovation continues this past week with window framing for new windows, new door openings cut in and framed for interior doors to the first floor ADA restroom and librarians work room, removing old chimney foundation, preparation for pouring a new basement concrete floor, removal of old electrical wiring, stabilizing the south exterior rock wall foundation in preparation for new ADA elevator, stair tower and addition foundations and walls. An additional reminder that the library has temporarily been relocated to the lower level of the Town Hall as there have been a few folks walking into the project site looking for the library! Please help keep everyone safe by this reminder!!